Projects
Project: |
Drive Over Hopper Stacker |
Client: |
Ahrens Engineering |
When: |
2007 |
| 1 set of Hopper, ramps and grates | |
|---|---|
| Tonnage: | approx 10 |
Consortiums involvement |
|
| Bowhill Engineering: | Head Contractor, drawings & material supply, surface preparation and treatment, transport to client. |
| Horwood Bagshaw: | Processing, fabrication/welding and fitting of pans. |

