Projects
Project: |
Murray River Lock and Weir modifications and Construction of a fishway |
Client: |
York Civil and Built Environs |
When: |
2002- 2008 |

| Project Lock and Weir Modifications and Upgrades (Locks 1,7,8,9,10 to date): | |
|---|---|
| Tonnage: | 60t each project |
Consortiums involvement |
|
| Bowhill Engineering: | Detailed shop drawings, material supply, fabrication & welding, blasting/painting with glass flake epoxy coating, S/S fabrication, welding and in-house passivation by submersion, aluminium fabrication and welding, assembly of subcomponents with guide plastics, rubber and S/S fixings etc, delivery to site, fitting and adjustment of removable deck units. |