Project:

Murray River Lock and Weir modifications and Construction of a fishway

Client:

York Civil and Built Environs

When:

2002- 2008

 

Project Lock and Weir Modifications and Upgrades

Project Lock and Weir Modifications and Upgrades (Locks 1,7,8,9,10 to date):
Tonnage: 60t each project

Consortiums involvement
 
Bowhill Engineering: Detailed shop drawings, material supply, fabrication & welding, blasting/painting with glass flake epoxy coating, S/S fabrication, welding and in-house passivation by submersion, aluminium fabrication and welding, assembly of subcomponents with guide plastics, rubber and S/S fixings etc, delivery to site, fitting and adjustment of removable deck units.

 

Project Lock and Weir Modifications and Upgrades